Commercial Projects
Forest Road Storage Units
- Supply and Erection of 2 separate storage sheds containing 7 units on one side and 9 units on the other side
- Quality Galvanised Formsteel System, clear span, 4 bays, mono slope roof with 100 x 100 purlins and studs and nested 270 rafters and columns.
- Pre-cast tilt panels
- 16 roller doors
Onion Shed – Edens Road
- Supply & Erection of 630sq/m Formsteel Technologies storage shed
- Five metre knee with no additional bracing to allow pallet storage to 4.8 Metres
Project: Onion Shed
Location: Eden’s Rd, Hope
Size: 630 Sqm Onion Shed
(supply of kit and erection only)
Completion: February 2016
SGS Westport Stage Two
- Supply and Erection of 700 sqm Formsteel Technologies Building
- Twin tenancy
- Pre-cast tilt panels
- Two roller doors
Project: SGS Westport Stage Two
Location: Westport
Size: 266 Sqm
Completion: April 2013
Save Mart Invercargill
- Supply and Erection of 1265sq/m Clearspan Formsteel Technologies Building.
- Three roller doors, PA doors and Tilt panels along the length (70m) of the South and East side of building, 6m knee.
- Including earthworks, foundations and pad.
- Alucobond and Aluclad feature cladding to office walls.
- The lightweight nature and strength of the Formsteel technologies buildings are its biggest benefits with regards to its ability to withstand severe seismic activity proven in the Christchurch earthquakes.
Euroquip Development
- Supply & Erection of 1750 sq/m Formsteel Technologies Building. 10m Knee rising to 11.9m.
- Including earthworks, foundations and pad. Foundations formed for Tilt panels to all sides of building.
- Post tensioned, Laser Screed floor for warehouse. Two story offices with
- Alucobond to all external offices.
- Car parking and driveways included, as well as Right of Way to north side of development
Save Mart Unit 3
- Supply & Erection of 2465 sq/m Formsteel Technologies Building.
- Kingposts down centre of building.
- Six roller doors, PA doors and Tilt panels along the length (44m) of the South side of building Including earthworks, foundations and pad.
- Foundations and pad included 497 x 5.4m piles driven to the Hiley formula.
- Reid bars inserted into piles connecting to HD16 steel to form reinforcing for pad.
- Included Gas sealed methane barrier. Novaflow methane vents under pad connecting to rato vents either side of building.
- Included 50sq/m of office space.
- Alucobond and Aluclad feature cladding to offices and North Face of building
Save Mart Unit 2
- Supply & Erection of 1225 sq/m Clearspan Formsteel Technologies Building.
- Five roller doors, PA doors and Tilt panels along the length (56m) of the East side of building Including earthworks, foundations and pad.
- Foundations and pad included 308 x 2.7m piles driven to the Hiley formula.
- Reid bars inserted into piles connecting to HD16 steel to form reinforcing for pad. Included Gas sealed methane barrier.
- Novaflow methane vents under pad connecting to rato vents either side of building. Included 50sq/m of office space.
- Alucobond and Aluclad feature cladding to office walls.
Save Mart Unit 1
- Supply and Erection of 1208sq/m Clearspan Formsteel Technologies Building.
- Four roller doors, PA doors and Tilt panels along the length (56m) of the East side of building.
- Including earthworks, foundations and pad. Included Gas sealed methane barrier.
- Novaflow methane vents under pad connecting to rato vents either side of building. Included were 50sq/m of office space.
- Alucobond and Aluclad feature cladding to office walls.
- The lightweight nature and strength of the Formsteel technologies buildings are its biggest benefits with regards to its ability to withstand severe seismic activity proven in the Christchurch earthquakes.